A big live-edge walnut slab on a black iron pipe base.
One long walnut slab with the live edge left on, set on a black iron pipe frame with a stretcher bar along the bottom.
The slab came home in February 2017, the finish went on in November 2017, and the finished table photos are from December 2017. The last photo up top is the table today.